Close Menu
    What's Hot

    CBE’s 233 MW Kamoa Project Comes Online with AIKO ABC Modules

    September 12, 2026

    UAE-Germany ties in focus during presidential visit

    September 10, 2026

    iPhone 18 Pro brings variable aperture and A20 Pro chip

    September 10, 2026
    Facebook X (Twitter) Instagram
    Trending
    • CBE’s 233 MW Kamoa Project Comes Online with AIKO ABC Modules
    • UAE-Germany ties in focus during presidential visit
    • iPhone 18 Pro brings variable aperture and A20 Pro chip
    • Apple launches iPhone Duo foldable starting at $1,999
    • Can Doing Good Create Business Value?
    • Aircom Appoints Khurram Chaudhry as General Manager
    • Gold steadies near $4,400 with US inflation in focus
    • RAMINVEST HOLDING Advances Mauritania Gold Exploration Following 50.14 g/t Gold Assays at Wompou Project
    • Home
    • Contact Us
    Cairo GuardianCairo Guardian
    Saturday, September 12
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Cairo GuardianCairo Guardian
    Home » CBE’s 233 MW Kamoa Project Comes Online with AIKO ABC Modules

    CBE’s 233 MW Kamoa Project Comes Online with AIKO ABC Modules

    September 12, 2026 PR Newswire
    Share
    Facebook Twitter LinkedIn Pinterest Email

    YIWU, China, Sept. 12, 2026 /PRNewswire/ — CrossBoundary Energy’s (CBE) 233 MW Kamoa solar project in the Democratic Republic of the Congo (DRC) has achieved full-capacity grid connection and entered commercial operation. Completed just 16 months after the power purchase agreement was signed, the project sets a new delivery benchmark for large-scale solar in Africa.

    Image source: Kamoa Copper S.A.

    Powered by AIKO’s high-efficiency ABC modules, Kamoa is Africa’s first project to provide round-the-clock baseload power entirely through an integrated solar-plus-storage system. It offers a replicable clean energy solution for mining operations seeking both reliable power and lower carbon emissions.

    The project is located next to the Kamoa-Kakula Copper Complex, one of the world’s largest copper mining operations. Remote mines across Africa have traditionally relied on diesel generators to sustain continuous production, leaving operators exposed to fuel-price volatility and increasing carbon-related compliance costs.

    Kamoa uses approximately 360,000 AIKO 655 W dual-glass modules in the 66-cell format. With a mass-production efficiency of 24.2%, each module delivers 30 W more power than comparable products of the same format. Their superior temperature coefficient and hotspot suppression performance also support stable generation and system safety under the mine’s hot, high-irradiance conditions.

    By combining lower levelized cost of energy with reliable round-the-clock supply, the project replaces conventional diesel generation, reduces energy-price risk and lowers the carbon footprint of Kamoa’s copper production. This strengthens the competitiveness of its products as carbon requirements tighten in international markets.

    Over its 30-year lifecycle, Kamoa is expected to generate 7.8 billion kWh of electricity and avoid approximately 78,800 tonnes of carbon emissions annually. As the DRC diversifies beyond its hydropower-dominated energy mix, the project provides a valuable model for integrating renewable power with mining across Africa.

    The successful delivery of Kamoa further strengthens AIKO’s position in Africa’s fast-growing solar market. AIKO will continue to advance the global energy transition through high-efficiency technology and long-term value creation.

    Cision View original content to download multimedia:https://www.prnewswire.co.uk/news-releases/cbes-233-mw-kamoa-project-comes-online-with-aiko-abc-modules-302876862.html

    Keep Reading

    Can Doing Good Create Business Value?

    Aircom Appoints Khurram Chaudhry as General Manager

    RAMINVEST HOLDING Advances Mauritania Gold Exploration Following 50.14 g/t Gold Assays at Wompou Project

    World’s First Robot Sports League Launched in Riyadh, Plans to Hit 8 Cities Worldwide

    $1 Million Awarded to Social Impact Student Start-Up at 2026 EF Hult Prize

    Adani Airports to raise ~USD 1 billion of primary equity from marquee global investors

    Latest News

    UAE-Germany ties in focus during presidential visit

    September 10, 2026

    iPhone 18 Pro brings variable aperture and A20 Pro chip

    September 10, 2026

    Apple launches iPhone Duo foldable starting at $1,999

    September 10, 2026

    Gold steadies near $4,400 with US inflation in focus

    September 10, 2026

    Ballon d’Or 2026 shortlist sets stage for London awards

    September 9, 2026

    US battery growth still depends on Chinese materials

    September 9, 2026

    Panama Canal could cut daily ship limit to 29

    September 9, 2026

    Etihad sets October start for Abu Dhabi Saudi Red Sea route

    September 9, 2026
    © 2026 Cairo Guardian | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.